skip to Main Content
  0845 899 4444      sales@makers.biz   
ICCP Omni Edinburgh

Makers have significant experience in the long term usage of many differing electro-chemical techniques for corrosion control:

  • Surface Applied Corrosion Inhibitors  (SACI)
  • Drilled in Corrosion Inhibitor capsules
  • Galvanic Anodes
  • Impressed Current Cathodic Protection
    • Sprayed Overlay
    • Discreet Anodes
    • Ribbon Anodes
    • Painted Anode
    • Protector AS – Camur ZEBRA Cathodic protection(deck applied)

The treatment of reinforced concrete using electro-chemical techniques to assist in the control in corrosion of steel is widely accepted throughout the Structural Refurbishment industry.

Cathodic ProtectionThe use of Electro-chemical processes usually contain both structural remediation as well as the chosen technology. In order to achieve the correct design parameters, levels of corrosion need to be understood, Makers advocate that full diagnosis testing takes place prior to any electro-chemical design or application.

Makers have been strong advocates of their usage, specifically in multi-storey car parks, but equally in the control of deep seated carbonation as related to other insitu and precast reinforced concrete structures and for structures where chloride based accelerators were used in construction.

Many of the structures treated by us, have ongoing monitoring, this is in form of embedded corrosion rate and ½ cell probes, in order to understand fully the degree of control exerted by the various processes on the reinforcement corrosion.

Controls can comprise of either, manually obtained data, data from loggers installed on site, or data transmitted from the installation over the internet, on a Virtual Private Network (VPN). Makers have good examples of both situations.

Anode installation systemMakers work in conjunction with Corrosion design experts in order to produce systems that cater for the structural issues and allow best value engineering. Each design process must be looked at an individual basis to produce effective solutions.

denver 2 This approach to Contracting was rewarded with the International ICRI (International Concrete Repair Institute) award for “Project of the Year Concrete Repairs 2006”. This was the first time, a UK contractor had been presented the award which was received at an awards ceremony in Denver, Colorado USA.
icon_big_casestudy Case Studies

 

Call us on 0845 899 4444 or email sales@makers.biz

Related Case Studies

Hugh Baird College Concrete Repairs

Hugh Baird College Concrete Repairs The 49 year old 1970’s building was deteriorating, being close to the River Mersey with salt air, it’s coatings and…

Omni Centre Basement Car Park Scotland

Omni Centre Basement Car Park Scotland In 2019 Makers were approached by the owners of the Omni multi storey car park via their agents to…

Coptfold Road MSCP

Coptfold Road MSCP Coptfold Road Multi-Storey Car Park was originally built in 1972 with its concrete framed structure and brick outer skin, it consists of…

Mailbox MSCP, Birmingham

Mailbox MSCP, Birmingham The Mailbox is a destination shopping complex in the heart of the City of Birmingham, formerly known as the Royal Mail sorting…

Preston Bus Station MSCP

Preston Bus Station MSCP Designed in the late 60’s this 9 level multi-storey car park consisted of cast in situ reinforced concrete slabs and columns…

Intu Victoria Shopping Centre

Intu Victoria Shopping Centre The Nottingham Intu Victoria Shopping Centre sits on the original site of the Victoria Train Station which was demolished in 1967…

BT Westgate

BT Westgate BT Westgate offices is located in close proximity of Leeds City Centre and is situated amongst residential, student lets and leisure and retail…

The Quadrangle, Cheltenham

The Quadrangle, Cheltenham The Quadrangle was constructed in 1973 by owners land and House Developments providing some 5300m2 of office and retail complex, it replaced…

Arndale Centre MSCP, Eastbourne

Arndale Centre MSCP, Eastbourne The Arndale Shopping Centre and Multi-Storey Car Park with Spiral Ramp were constructed in the 1970's and were in much need…

Allhallows MSCP, Bedford

Allhallows MSCP, Bedford Innovative DESIGN ENGINEERING by Makers ensured the commercial viability of the refurbishment of Bedford’s Allhallows multi-storey car park. The successful 10 year…

Centre Tower, Birmingham

Centre Tower, Birmingham This commercial property, located in Hill Street in the heart of Birmingham City Centre, offers 21 floors of office accomodation. The podium…

Hanley GSC, Stoke-on-Trent

Hanley GSC, Stoke-on-Trent Hanley GSC represents a major telecommunication facility for BT and is positioned within the City boundaries of Stoke-on-Trent, on a very congested…

Our Services

Our Services

READ MORE

Case Studies

Case Studies

READ MORE

Our Clients

Our Clients

READ MORE

Back To Top