skip to Main Content
  0845 899 4444      sales@makers.biz   
Weston College Structural Refurbishment

Weston College Structural Refurbishment

Weston College Structural Refurbishment

Weston College Structural RefurbishmentWeston College’s current Knightstone Campus was opened in September 1970.

Throughout the years the building’s façades had degraded with the corrosive salt air, and in time has caused spalling from lintels, vertical jambs and window sills exposing the reinforced bars.  Its original cream colour had lost its shine and was lacklustre.

Makers won the tender to carry out the structural refurbishment works over a 13-week programme and required…

See the .pdf for the full Structural Refurbishment Case Study…

Call us on 0845 899 4444 or email sales@makers.biz

Weston College Structural Refurbishment

Our Services

Our Services

READ MORE

Case Studies

Case Studies

READ MORE

Our Clients

Our Clients

READ MORE

Back To Top