Weston College Structural Refurbishment
Weston College’s current Knightstone Campus was opened in September 1970.
Throughout the years the building’s façades had degraded with the corrosive salt air, and in time has caused spalling from lintels, vertical jambs and window sills exposing the reinforced bars. Its original cream colour had lost its shine and was lacklustre.
Makers won the tender to carry out the structural refurbishment works over a 13-week programme and required…
See the .pdf for the full Structural Refurbishment Case Study…
Call us on 0845 899 4444 or email sales@makers.biz