skip to Main Content
  0845 899 4444      sales@makers.biz   
IKEA Reading Car Park Refurbishment

IKEA Reading Car Park Refurbishment

IKEA Reading Car Park Refurbishment

Ikea Reading Steel Frame Multi-storey Car Park RefurbishmentIn 2016 Ikea constructed its superstore and multi-storey car park at Reading. The car park consisted of 4 floors using a steel frame, precast plank and structural topping configuration providing 1000 parking spaces for visiting customers.

At the time of initial build, Ikea selected a Sika Pronto 32 fully reinforced system to cover and protect the external top deck. Thermal expansion provision was provided above the beam lines in the form of induced sealant joints and the deck 9600m2 was divided into colour co-ordinated parking bays and drive isles.

Following a routine maintenance inspection some two years after the initial build the car park surfacing was showing some initial small blisters in isolated areas. The ring-shaped pattern was not immediately obvious but signs of “outgassing” seemed to proliferate to other areas with some parts of the system becoming de-bonded mainly in the main drive isles due to cyclical traffic movements.

See the .pdf for the full Multi Storey Car Park Refurbishment Case Study…

Call us on 0845 899 4444 or email sales@makers.biz

Ikea Reading Steel Frame Multi Storey Car Park Refurbishment Case Study

Our Services

Our Services

READ MORE

Case Studies

Case Studies

READ MORE

Our Clients

Our Clients

READ MORE

What Our Clients Say

The best contractor I have ever used on a major car park refurbishment. As far as Makers are concerned there is no improvement needed!

Senior Engineer, NPS Norwich Limited St Giles MSCP, Norwich

Makers provided all works to a very high quality and were highly accommodating in dealing with additional scope of works.

Director, Building & Consultancy, CBRE Mailbox, Birmingham

Makers delivered an excellent project on time and under budget… I would not hesitate in recommending Makers.

Facilities Manager, Hertfordshire County Council County Hall, Hertford

It was a really professional delivery from start to finish of the contract… Couldn't fault it.

Simon Richardson Villa Farm
Back To Top