Victoria Square “The River” Concrete Repairs
Birmingham had entered into the running for hosting the 2022 Common Wealth Games and so in January 2021 The River was in the mix for renovation to be up and running and in full flow in time for the Games.
Makers were approached to carry out the concrete repairs to the internal face and base of the fountain to provide a solid smooth surface for the pool liner to be installed. The programme included all internal upstands and internal base of the fountains and the works had to be completed in the allotted timeframe during December 2021.
See the .pdf for the full Concrete Repair Case Study…
Call us on 0845 899 4444 or email sales@makers.biz
What Our Clients Say
The best contractor I have ever used on a major car park refurbishment. As far as Makers are concerned there is no improvement needed!
Makers provided all works to a very high quality and were highly accommodating in dealing with additional scope of works.
Makers delivered an excellent project on time and under budget… I would not hesitate in recommending Makers.
It was a really professional delivery from start to finish of the contract… Couldn't fault it.





